
(Central News Agency correspondent Shen Feng Ilan 30th) Su-Hua Highway Ilan O section 27 due east embankment gap interrupted by the Directorate General of Highways repair the single-wire bi-directional control after the passage today, but for safety, only 21 tons at this stage the opening of the following vehicles , overweight vehicles may only pass to the end of the year. Highway Administration, said at the Su-Hua Highway 115.8 km (east of Ilan O section) 9 affected by heavy rain, outside road ...Su spent the following 21 tons reopened to traffic
No comments:
Post a Comment